• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer
  • Home
  • Regional
    • Davao Region
    • Northern Mindanao
    • Soccsksargen
    • Caraga Region
    • Zamboanga Peninsula
  • Categories
    • Top Stories
    • Environment
    • Police Files
    • Business
    • Davao Region
    • BARMM
    • Newslights
    • Agriculture and Food
    • Bisaya Kini
    • Where’s Our Money
    • War On Drugs
  • About Us
  • Contact Us
  • Privacy Policy
NewsLine Philippines

NewsLine Philippines

Building Information Highway for the Community

  • Top Stories
  • Business
  • Health
  • Environment
  • War On Drugs
  • Bisaya Kini
  • OFW News
  • July 1, 2025

‘Build, Build, Build’ beyond 75 key infra projects: DOTr

November 14, 2019 by Philippine News Agency

MANILA — The Department of Transportation (DOTr) on Wednesday rejected Senate Minority Leader Frank Drilon’s claim that the “Build, Build, Build” (BBB) program was a failure, citing numerous completed and ongoing infrastructure projects of the Duterte administration.

In a phone interview, DOTr Assistant Secretary for Communications and Commuter Affairs Goddes Hope Libiran said the list presented by the National Economic and Development Authority (NEDA) which include 75 flagship projects were submitted back at the beginning of President Rodrigo Duterte’s term and does not reflect the evolving needs of the country.

“As you go along, you need to have an evolving list kung ano yung mga projects na sa tingin ng economic managers kailangan masimulan saka mas kailangan ng mga tao ngayon (of what projects are seen by economic managers as necessary to begin and most needed by people),” Libiran said.

Such a list, Libiran said, would naturally include projects that should be completed or started during the Duterte administration.

She added that the BBB project was beyond those initial 75 projects and that the department has already completed numerous projects with more ongoing.

“As far as the DOTr is concerned, nagde-deliver kami ng mga (we deliver) infrastructure projects. Even more than what is expected of us,” Libiran said.

For airports, Libiran said 64 projects have been completed by the DOTr and its partners, with another 133 projects ongoing.

The completed airport projects include the new passenger terminal building of the Puerto Princesa International Airport completed on May 2017, “World’s Friendliest Resort Airport” Mactan-Cebu International Airport inaugurated on June 2018, the country’s first eco airport—Bohol-Panglao International Airport—inaugurated on November 2018, among many others.

“All other domestic projects na napabayaan in the last years, natapos natin (that were neglected in previous years, we completed)—the Ormoc Airport, the Tacloban Airport, and so many other airport projects,” Libiran said.

For maritime ports, she said the DOTr has completed 243 port projects nationwide in partnership with the Philippine Ports Authority and other stakeholders.

For land terminals, she cited the completion of the country’s first land port, the Parañaque Integrated Terminal Exchange, with two more terminals in the pipeline—the Taguig City Integrated Terminal Exchange and the North Integrated Terminal Exchange.

Libiran said there are also numerous ongoing rail projects with six under construction, one rehabilitation project, and another eight in the pipeline.

The ongoing projects include the Metro Manila Subway which broke ground in Feb. 2018, the MRT-7 which was 49.22 percent complete as of October, MRT-3 rehabilitation which began in May 2019, and the Common Station for the MRT-3, MRT-7, LRT-1, and the Metro Manila subway to be completed in 2021, among others.

“Yung subway nga lang eh. ‘Di ba, when we came in, sinasabi nila diyan, drawing lang yan, hindi daw totoo. Nananaginip lang daw kami. Pero ano nangyari? Nag-groundbreaking tayo nung February (Let’s just talk about the subway. Isn’t it when we came in, they were saying this will not push through? That we were just dreaming. But what happened? We already had a groundbreaking back in Feb.),” Libiran said.

During plenary deliberations on the proposed 2020 budget on Tuesday, Drilon said the BBB project was a “dismal failure” with only nine out of 75 flagship projects under construction halfway into Duterte’s term. (PNA)

Filed Under: Business, Top Stories Tagged With: Build build build in PH

Primary Sidebar

loader-image
Davao City
Davao City, PH
4:50 am, Jul 1, 2025
temperature icon 24°C
broken clouds
Humidity: 100 %
Wind: 2 mph
Clouds: 75%
Sunrise: 5:25 am
Sunset: 5:57 pm
Detailed weather
Weather from OpenWeatherMap
  • Human trafficking
  • Bisaya Kini
  • Business
  • Health
  • Environment
  • War On Drugs
  • Newslights
  • OFW News
  • Top Stories
  • Where’s Our Money

Youtube Videos

  • Kabataan nga miyembro sa tribung Badjao, benepisyaryo sa food packs ug educational materials sa PDEA
    by NEWSLINE PHILIPPINES at 3:00 am
  • 25.5 tons sa sibuyas bombay, nasakpan sa boc sa Mindanao Container Terminal sa Tagoloan, MisOr
    by NEWSLINE PHILIPPINES at 2:00 am

Top Stories

25 human trafficking victims rescued in Tawi-Tawi

June 30, 2025 By Editha Z. Caduaya

Police officer shot dead by mother-in-law in Sultan Kudarat

June 30, 2025 By Jerick Wee

Negosyanteng babaye gipusil-patay sa Davao

June 29, 2025 By Paul Palacio

Filipino community hails Philippine Embassy in Israel for swift, compassionate response amid Iran-Israel conflict

June 29, 2025 By Althea Beatrice Caduaya Felizarta

Six Filipinos return home from Iran

June 28, 2025 By Philippine News Agency

More Top Stories Post

Opinion

Content with Purpose: Lessons from Krakow

May 7, 2025 By Editha Z. Caduaya

Duterte’s Arrest: A Victory for EJK victims or an injustice to his legacy?

March 12, 2025 By Editha Z. Caduaya

Senators failed to get what they wanted from Duterte

October 30, 2024 By Editha Z. Caduaya

More Opinion Post

Environment

Magnitude 6.9 earthquake jolts Eastern Sarangani

June 28, 2025 By Paul Palacio

Billboards with officials’ names, images to be removed under new Executive Order

June 25, 2025 By NewsLine Philippines

More Environment Post

Governance

More Governance Post

Footer

Contact Us

Newsline Philippines
Mobile: +63917 150 8377
Email Address: newslineph.corres@gmail.com or newsline.ph@gmail.com

Bisaya Kini

Negosyanteng babaye gipusil-patay sa Davao

June 29, 2025 By Paul Palacio

Car wash boy gipusil-patay sa North Cotabato

June 27, 2025 By Giovani del Mundo

Kanhi Misamis Occidental congressman nakonbikto  tungod sa PDAF scam

June 14, 2025 By Paul Palacio

16 ka fighter jet gigama sa US aron ihanyag sa Pilipinas

June 7, 2025 By Paul Palacio

Pagbalasa Kabinete gipaspasan sa Palasyo

June 1, 2025 By Paul Palacio

More Bisaya Kini Post

Agriculture and Food

China Coast Guard blasts Filipino boats with water cannons at Panatag Shoal

June 24, 2025 By Editha Z. Caduaya

Boosting Rice Production in the Philippines: Techno Farms, Policies, and Price Challenges

June 20, 2025 By Editha Z. Caduaya

Northern Mindanao Launches Sale of ₱20 Rice for Minimum Wage Earners

June 13, 2025 By Paul Palacio

More Post

DISCLAIMER

Newsline Philippine website welcomes healthy discussion, exchange of opinions friendly debate, but comments posted by our readers does not reflect the views and opinion of Newsline Philippines.

Newsline Philippines reserves the right to delete, reproduce, or modify comments posted here without notice. Posts that are inappropriate and does not follow community standard will automatically be deleted.

Newsline Philippines IPO Reg. No. 4/2017/005044896
Newsline Philippines · Copyright © 2025 · All Rights Reserved