• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer
  • Home
  • Regional
    • Davao Region
    • Northern Mindanao
    • Soccsksargen
    • Caraga Region
    • Zamboanga Peninsula
  • Categories
    • Top Stories
    • Environment
    • Police Files
    • Business
    • Davao Region
    • BARMM
    • Newslights
    • Agriculture and Food
    • Bisaya Kini
    • Where’s Our Money
    • War On Drugs
  • About Us
  • Contact Us
  • Privacy Policy
NewsLine Philippines

NewsLine Philippines

Building Information Highway for the Community

  • Top Stories
  • Business
  • Health
  • Environment
  • War On Drugs
  • Bisaya Kini
  • OFW News
  • July 31, 2025

Marcos to finish Mindanao Railway Project

July 26, 2022 by NewsLine Philippines

DAVAO CITY — The hope for the realization of the Mindanao Railway Project (MRP) is alive, this after President Ferdinand Marcos Jr. in his first State of the Nation Address on Monday (SONA) said his administration is committed to finish building the current portfolio of investments.

In said speech, Marcos said. “Approved railway projects such as:

  • System… the 33-kilometer Metro Manila Subway
  • Project… the 147-kilometer North-South Commuter
  • Railway System… the 12-kilometer LRT-1 Cavite Extension…
  • the 23-kilometer MRT-7… and the Common
  • Station that will connect LRT-1, MRT-3 and MRT-7.
  • Beyond NCR, larger scale railway systems like the 102-kilometer Mindanao Railway Project;
  • Panay Railway Project; and the Cebu railway system

Will be be integrated as a vital part of our transport and communications systems. 

On July 15, 2022, Undersecretary for Railways Cesar Chavez revealed that the MRP was deemed cancelled as the Chine Bank failed to act on it before June 30, 2022, in time for former President Rodrigo Duterte to step down.

The same commitment he gave to improve our roads and transportation systems in key cities throughout the country through various projects such as the Cebu Bus Rapid Transit, Davao High Priority Bus System, Ilocos Norte Transportation Hub, and the El Nido Transport Terminal.

The President has ordered the Department of Public Works and Highways (DPWH) to move “Full Speed Ahead.”

He emphasized “Improving our railway system, along with modernizing existing airports and seaports, will maximize our strategic location in the Pacific. And connect our many islands. “

With the pronouncements, Mindanaoans will just have to wait for its realization.-Editha Z. Caduaya

Filed Under: Top Stories, Where's Our Money Tagged With: latest Mindanao Railway Project, Marcos pushes for Mindanao Railway Project

Primary Sidebar

loader-image
Davao City
Davao City, PH
5:24 am, Jul 31, 2025
temperature icon 25°C
broken clouds
Humidity: 100 %
Wind: 5 mph
Clouds: 75%
Sunrise: 5:30 am
Sunset: 5:56 pm
Detailed weather
Weather from OpenWeatherMap
  • Human trafficking
  • Bisaya Kini
  • Business
  • Health
  • Environment
  • War On Drugs
  • Newslights
  • OFW News
  • Top Stories
  • Where’s Our Money

Youtube Videos

  • Kapin libo ka trabaho alang sa mga 'Differently-Abled Persons' gihanyag sa Job Fair sa Davao City
    by NEWSLINE PHILIPPINES at 12:00 am
  • Seagrass ug Coral Mapping gihimo sa mga Environmental Scientist sa coastline sa Tagum City
    by NEWSLINE PHILIPPINES at 11:00 pm

Top Stories

Davao Light opens 138 kV ERA Line 2 to Boost Power Supply

July 29, 2025 By NewsLine Philippines

President Marcos appoints Justice Mariflor Castillo as Acting Ombudsman

July 28, 2025 By NewsLine Philippines

Buried in silence, another life lost to gold

July 28, 2025 By Editha Z. Caduaya

Torre vs. Baste: No punches thrown, yet lives will be lifted

July 27, 2025 By Editha Z. Caduaya

PH urges Peaceful Resolution in Thailand-Cambodia conflict

July 27, 2025 By Philippine News Agency

More Top Stories Post

Opinion

Content with Purpose: Lessons from Krakow

May 7, 2025 By Editha Z. Caduaya

Duterte’s Arrest: A Victory for EJK victims or an injustice to his legacy?

March 12, 2025 By Editha Z. Caduaya

Senators failed to get what they wanted from Duterte

October 30, 2024 By Editha Z. Caduaya

More Opinion Post

Environment

Buried in silence, another life lost to gold

July 28, 2025 By Editha Z. Caduaya

Rains to continue due to ‘Emong,’ ‘habagat’

July 26, 2025 By Philippine News Agency

More Environment Post

Governance

More Governance Post

Footer

Contact Us

Newsline Philippines
Mobile: +63917 150 8377
Email Address: newslineph.corres@gmail.com or newsline.ph@gmail.com

Bisaya Kini

45 anyos ng lalaki sikop sa buy bust operation

July 5, 2025 By Paul Palacio

Negosyanteng babaye gipusil-patay sa Davao

June 29, 2025 By Paul Palacio

Car wash boy gipusil-patay sa North Cotabato

June 27, 2025 By Giovani del Mundo

Kanhi Misamis Occidental congressman nakonbikto  tungod sa PDAF scam

June 14, 2025 By Paul Palacio

16 ka fighter jet gigama sa US aron ihanyag sa Pilipinas

June 7, 2025 By Paul Palacio

More Bisaya Kini Post

Agriculture and Food

President Marcos vows support for Fisheries Sector in GenSan visit

July 4, 2025 By NewsLine Philippines

China Coast Guard blasts Filipino boats with water cannons at Panatag Shoal

June 24, 2025 By Editha Z. Caduaya

Boosting Rice Production in the Philippines: Techno Farms, Policies, and Price Challenges

June 20, 2025 By Editha Z. Caduaya

More Post

DISCLAIMER

Newsline Philippine website welcomes healthy discussion, exchange of opinions friendly debate, but comments posted by our readers does not reflect the views and opinion of Newsline Philippines.

Newsline Philippines reserves the right to delete, reproduce, or modify comments posted here without notice. Posts that are inappropriate and does not follow community standard will automatically be deleted.

Newsline Philippines IPO Reg. No. 4/2017/005044896
Newsline Philippines · Copyright © 2025 · All Rights Reserved