Zamboanga City’s 22nd fire substation turned over to LGU on Saturday, June 3. The 128 square meter fire station on the 519 square meter lot is worth P7.2 million, and was completed within five months after construction began. Mayor John Dalipe and Vice Mayor Josephine Pareja attended the turnover ceremony, with other local, barangay, and […]